MOQ and sampling
400 pcs per insulated OEM colorway unless the brief funds a smaller lab run. 300 pcs for uninsulated daypacks. 15-20 working days after artwork freeze on foam SKUs. Stock SKUs skip this clock and quote in one business day.
Yeti OEM programs document MOQ, sampling windows, print and embroidery marks, colorway cuts and compliance files for brand and team backpack buyers. This page is a factory brief: start with litre band and foam or fabric, then marks, then carton language. Team jersey-style numbers belong on a 420D overlay, not on a welded TPU face.
Stock-wholesale freezes 600D cooler shells, 420D travel bodies and 1000D duffel bases on the current line card. Private-label OEM may change color and marks but not the foam thickness, liner film or rain-film type without a new sample. That dispute — catalog speed versus a rewritten chassis — is the usual reason a five-day OEM proposal is longer than a one-day stock quote.
OEM colorways usually open at 400 finished insulated packs. Uninsulated daypacks can open at 300. Frozen-artwork samples leave in 15-20 working days for foam SKUs after pantone notes are locked, and 12-18 working days for uninsulated lasts. Screen print sits on 600D overlays; welded TPU takes heat-transfer panels because dense crests crack after flex at the weld. Team jersey-style numbers belong on a 420D overlay, not on an M20 cooler face panel.
We do not claim a factory-wide OEKO-TEX blanket. OEKO-TEX STANDARD 100 is cited on named textile components. bluesign mill letters are cited only with mill scope. ISO 9001:2015 is the quality system, not a fabric certificate. amfori BSCI summaries travel with the first sample when the EU buyer asks.
Request a capability auditThe industry still argues stock-wholesale against private-label OEM as if they were the same PO. Yeti treats them as two codes. A colorway swap on a frozen 27L travel last is a hangtag and carton-mark job. A denier swap, a foam-thickness change, or a membrane instead of 1,500 mm PU restarts the sample clock. If the brief needs team numbers, we name print method against the fabric. If it only needs a woven mark, we refuse a sublimation quote on welded TPU.
400 pcs per insulated OEM colorway unless the brief funds a smaller lab run. 300 pcs for uninsulated daypacks. 15-20 working days after artwork freeze on foam SKUs. Stock SKUs skip this clock and quote in one business day.
Screen on 600D. Heat transfer on TPU. Embroidery on 420D overlays. Panel recuts and foam die-cut changes reopen QC. Jersey numbers are a print-zone job, not a full-panel photo.
Pantone on the overlay, not a lifestyle hex. Polybag, hangtag and carton marks are part of the BOM. Mixed cartons do not lower the per-colorway minimum.
ISO 9001:2015, amfori BSCI, OEKO-TEX STANDARD 100 on contact parts, REACH, bluesign mill letters when booked, CPSIA for North America youth lines.
Capacity on the sewing line is quoted as weekly finished packs for the frozen silhouette, not as an unlimited range. A 25L daypack and a 20L cooler backpack do not share one hourly rate because bartack count, foam insertion and liner welding differ. Team programs that want jersey-style numbers across 400 chests still need a 400-piece insulated colorway floor unless leftover stock fabric is already dyed.
Limits we will put in the quote: DWR plus PU coating is not a dry-bag; laminated films add stiffness and may change zipper tape; welded TPU is not a print surface for dense crests; a one-size foam pad is not a torso-length harness; mini 7 L packs do not inherit 40 L hiking copy. Abrasion, UV, zipper-cycle and leak-check methods are listed on the sample report when the buyer asks; we do not invent a “2× more durable” headline without the method and the lab.
Ask for MOQ, sample window, print method, denier, foam thickness and dossier list on the same sheet. Customize only after those fields are frozen.